b-deck-10 - USS Spectrum - 01 Command - Spectrum Decks - Stardrive
USS Spectrum

Stardrive Section
Stardrive Section


- Deck 10 -

Docking Clamps



Docking Clamp Mechanics
Emergency Batteries
Phaser Bank Systems
Transporter Grid p/s
Chemical Labs
Main Power Feed


Emergency Equipment (EE)
Emergency Gases (EG)
Engineering Support (ES)
Equipment Support Closet (E)
Head (H)
Lab, Chemical (LE-CHEM)
Lab, Future Fit (LE-FF)
Lab, Geological (LE-GEO)
Phaser Accelerator (PHA)
Phaser Bank Array (PH)
Power BUS - Primary-Secondary Hull
Scndry Hull Locks & Struct Field Support Gen (L2)
Transporter Grid